admin

R-62041 FABRICATION E-70405 DEPROPANIZER CONDENSER

Application industry and destinationPTT Public Limited. ( PTT Gas Separation Plant, Rayong ) Material Service • Depropanizer exchanger • Ø1,900 x 11,200L, Carbon Steel 1 Unit (Low fin Tube Ø24.4 x 2.77t, Total 2850 tubes). Special requirement • ASME Sec VIII Div.1 / TEMA • This heat exchanger contains “Low Fin Tube,” which must be …

R-62041 FABRICATION E-70405 DEPROPANIZER CONDENSER Read More »

BR-62077 E242 HEAT EXCHANGER

Application industry and destinationVinythai Advanced Biochemical (Thailand) Co.,Ltd ( Maptaphut Industrial Estate, Rayong ) Material Service • Re-boiler steam condensate • ID 397 x 3,048L, Material Hastelloy C276 (Tube Ø25.4×1.65t, Total 100 tubes). Special requirement • ASME Sec VIII Div.1, TEMA R • Tube Bundle is Hastelloy C-276, which must be intensively fabricated. Total quality …

BR-62077 E242 HEAT EXCHANGER Read More »

R-61135 ECONOMISER TUBE BUNDLE AND CASING

Application industry and destinationOrganics Asia Co., Ltd. ( Taiwan ) Material Service • Part of an Economizer heat exchanger • Tube bundle size W Special requirement • ASME Sec I • Every individual of these eight (8) Bundles is identical and can replace each other wherever it is installed. Total quality control • PT/MT/RT/Tensile Test …

R-61135 ECONOMISER TUBE BUNDLE AND CASING Read More »

R-61065 FABRICATION FOR BOILER EQUIPMENT INNOVA (USA)

Application industry and destinationINNOVA (USA) ( USA ) Material Service • HRSG Ducks and Stacks – Boiler Inlet/Outlet Ducts 2 Units Carbon Steel Weight 76 MT – Stacks and Transition 2 Units Carbonsteel Weight 29MT Special requirement • AWS • The Transition needs to be fabrication prudently to meet the project specification. Total quality control …

R-61065 FABRICATION FOR BOILER EQUIPMENT INNOVA (USA) Read More »

R-61130 SUR CIVIL STRUCTURE AND PIPING (EPC)

Application industry and destinationSolvay Peroxythai Limited ( Maptaphut Industrial Estate, Rayong ) Material Service • Production Plant • EPC Work – Piping 125 Ton Stainless Steel 304L – Structue 36 Ton, Carbon Steel – Civil work 204 Sq.m. Special requirement • ASME Sec VIII Div1/ AWS D1.1 • EPC Project, Design include Civil, Structure, Piping …

R-61130 SUR CIVIL STRUCTURE AND PIPING (EPC) Read More »

R-61052 FABRICATION PIPING AND SKID

Application industry and destinationE-Square Environment & Engineering Co., Ltd. ( PTT LKU, Kampaengphet ) Material Service • Part of water treatment process 1. Pipe and Skid Structure – Piping API5L Gr.B 75,00DB -Structure 27 MT 2. Storage Tank 3 Units – Ø1,200×1,500H Special requirement • A typical skid, nothing special. Total quality control • RT/PT/MT …

R-61052 FABRICATION PIPING AND SKID Read More »